Tuesday, 5 June 2007

[BlogSite.006] Added Front Elevation

Based on final "Construction Set" drawing received today, I added front elevation to the upper left corner of each page.

I am also looking for blog templates that can display content in 3 columns, the current one only has 2...

[Tips.004] Always do Your Homework!

Building a house involves lots of money, you should definitely do your homework properly before making any commitment.

Some of the methods been used:
1. Ask friends/relatives/colleagues for opinion

2. Visit their display homes if available

3. Ask builder to provide contacts of existing customers who have built with them

4. Do some search on Internet for information related to the builder, try Google, Yahoo, or bestbuilder.com.au, ...etc.

5. Join some forums, one of the best one I have seen so far in Australia is homeone.com.au. I learned a lot from them, have a look and guaranteed you will find it very helpful as well.

6. Spend $600 (some asked for more) for an initial soil test, tender and drawing. After you look at the tender, went through a presentation, you might have a different idea about what's to be expected.

7. Shop around, as the designs are all different, it's difficult to compare apple to apple. But you can have a better idea of what each builder can provide with similar amount of money. Compare the size, number of rooms, interiors, kitchen, ...etc


Before we decided to go with our builder, we did lots of research. We visited at least 5 of their clients, some of the good things about them:

1. For similar amount of money, you can get bigger house, that is, cost per square meter is lower when compared to D*****, C****** and a few others.

2. It's a personal thing, we love bay windows, and some of their models (Princeton and Palace Regent) have a few bay windows included as standard. With Allworth, they don't do bay windows at all. With D***** and C****** you have to pay a lot extra for that.

3. They included lots of things as standard: hobs for all shower, granite benchtop for kitchen, all external walls are in brick (E*****, D***** used lots of timber on 1st floor), obscure glazing window for all bathrooms, the section above garage door are all in brick (D**** and C***** use timber)...etc.

4. They are quite flexible with changes. Some of the builders don't like to change their design. We have lots of difficulty with some builders in making changes, our builder is more flexible on that. But like all other builders, they all charge a lot for any changes.

5. They are willing to tack the skirting boards so that our timer floor installation won't cause major damage to our walls. D*****, C******* and A***** won't do that at all.

For the bad side:
1. I found this post from homeone.com.au where one of the client was very unhappy with them.

2. It's a family business, due to the size they can be quite slow. Specially with services after hand-over and dealing with council. For example, for council part, G*** is only person handling all documents. When it gets really busy there could be some delays. Luckily we have past that stage, our approval took 4 months, which we think it's not that bad.

We visited one Chinese family in North Epping, our builder still haven't install the air conditioning one month after hand-over.

3. We also visited a family who wasn't quite happy with them. I heard that during their construction, our builder was going through some restructure and changed 3 site managers/supervisor. Also, the client is not very happy about the tender price gone up $6000 in 6 months -- unfortunately that's the nature of the game, if you can't get council approval or still wouldn't sign the contract, it goes up every few months, not much you can do about that.

4. My colleague A*** at Hursville was also complaining about their slowness. He had to make lots of phone calls to get someone for post handover service. According to A*** the things that required service so far were: leaking laundry tube, a window that won't close properly and a door that won't shut properly.

So based on all above, after compared with all other builders, we still choose our builder.

To cover our back, we are also going to hire private inspector to check their work before we make any payment. G****, our landscaper also suggest us to buy some beers for the workers.

We will certainly keep a close eye on the construction work (we currently lived about 200M away from the place we are building) and hopefully everything turns out ok with not too many problems or surprises.

[Progress.007] Final Tender received, tree removal sort of approved...

Finally received our final "Contract Tender" and "Construction Set" drawings today via email. Will spend the whole week going through all items, figures and drawing details. According to A**** from our builder once contract signed, they can start construction within 2 to 3 weeks. Hopefully everything will be sorted out before end of June...

Council was on site to check the sick tree with bracket fungus and big mushroom this afternoon. Looks like they are ok with the tree removal, only problem is, our DA was approved with the condition of some tree protection clauses. Now that we want to remove the sick tree, we need to put in an amendment to the DA and wait for approval... This is a bit ridiculous, we were told to put in a tree removal application, now there's another application, extra $ to pay and possibly even longer delay as well.....

Saturday, 2 June 2007

[Progress.006] Builder done post-demolition inspection

Our builder sent someone on-site for post-demolition inspection on Friday and they were quite happy with the status. Only thing left is the tagging of the neighbour's power line across the front of the property. This has nothing to do with the demolition and it's a totally different story...

Still waiting for the final drawing to be done by our builder, after that we will review the tender & contract, once it's signed we are ready to start!!!

Attached a few photos below, the demolition by Dhilas was indeed quite good.

Before (Front):

Before (Back):


After (Front):

After (Back):

Friday, 1 June 2007

[Tips.003] You might need to start landscaping work before your construction...

Yes, I am not joking. If the frontage of you land is not wide enough and your land requires retaining walls at the back, you might need to start landscaping work before your construction...

Our neighbour waited more than 12 months for their house to be completed (almost there...). They started getting quotes for landscaping and then they found a major issue. The paths on both side of the newly build house is only about 1 M wide, that is, the gap between the newly build house and the fence on both sides. But the landscapers' hole drilling machines are much bigger/wider than that! This means all the hole drilling work (for retaining walls) has to be done by hand, and that would be really expensive.

Luckily both our backyards join together, there's no fence at the moment and we just got our house demolished. If they can get their hole drilling work done before our excavation starts, we don't mind them accessing their back yard through our currently vacant land.

To avoid the same mistake, we already have an arrangement between our landscaper and the builder. The builder will excavate the land first so that the cut and fill are all done, and everything in correct level. The builder will then put everything on hold for 2 weeks for our landscaper to finish the retaining walls at the back. The construction will then continues, and the landscaper will finish the front part some time next year...

So unless your land got wide frontage, or you are one of the lucky ones who have a flat, even land, and don't need to have any retaining walls at the back - don't forget about your landscaping!