Showing posts with label tips. Show all posts
Showing posts with label tips. Show all posts

Tuesday, 15 November 2011

A much cheaper (but also slower) way to get new plants

I have been doing this for a few months, the success rate is not 100%, but might worth a try if you are interested in saving money and most importantly - can wait patiently :-)

I first saw this Yates Plant Cutting Powder in Bunnings and thought might be a good idea.


It's very simple, just follow the instructions and keep watering it for first few weeks and most of time it should have roots and starts growing. I think it also depends on the type of plant, which season, which part of the plant did you cut, ...etc, also heard that better avoid flowering season and pick the time which is not too hot/cold. You might have to experiment it a bit to work out the best way for different plants.

The photo below is the most recent one I did last week. The one on lower right hand side was the previous one a few weeks back (or months? can't remember...). Yes, I am a bit lazy/greedy and tend to squeeze too many of them into one pot...


And of course, you need to find at least a full grown plant to cut first... Will leave it to you to work that part out :-)

Wednesday, 31 March 2010

[Tips.018] 2 Bathroom Ideas

Was chatting with a friend about some bathroom ideas the other day. While most of the ideas available on the Internet emphasize on tape ware and/or bath tub, there are 2 little things I like to share with everyone.

First one is shown in photo below from one of the display homes we visited during our last US trip. Did you notice other than the main mirror in the middle, there's an extra smaller mirror on the right hand side? At first I thought it was some sort of Makeup Mirror to allow you to look at different angles (from side/behind?), then I noticed it has some hidden secret in it.

As shown below, when it opens up, there's actually a small cabinet hidden behind. I think that's a pretty cool idea.


The second one is about the shower area. As shown in photo below - from a Domaine (now part of Clarenton) display home back around 2006, by simply extending the bath tub towards the shower area, you can easily create a little sitting area inside your shower where you can either sit down or hold/put other stuffs. This would be quite handy.

We also saw a shower during our US trip as below with similar design.

During our construction, we did ask for similar changes to our main ensuite, unfortunately the price quoted by our builder was quite expensive and it was later removed.

Hope you find this little tip helpful!

Monday, 23 February 2009

[Tips.017] A little tip about your drive way

We have a visitor the other day asking why we don't extend our drive way from our boundary to the road, as shown below from one of the houses in our suburb with the front part of drive way highlighted.

It would certainly look better and actually that was our original plan. But after discussion with our landscaper Joe, we learned that because that part of the drive way belongs to the council, there's a risk if we extend our paving all the way to the road.

We all know that occasionally, the council would have some sort of maintenance work on sewage, water pipes, gas pipes, underground pipes, ...etc for whatever reason. When it happens, your drive way could be more or less damaged. According to Joe, our council will only replace whichever part of the damaged drive way with concrete. To fix it properly using the same paving (or even concrete stencil surfacing) would be at our own cost.

Plus, as that could be X months/years later and it would be almost impossible to get the exactly same colour of bricks(as it would be from different batch), it won't look good at all!

Well, I guess you can say that we could just order extra bricks and keep it somewhere as spares. We did have some, but surely won't be enough if it's a major work. Plus the worry of extra cost and trouble also scares us a bit.

That's why after some discussion, we decided to do the paving of our drive way up to the boundary only.

One other thing is, may be your council is different from ours, better find out the answer from your council in case you believe extending the drive way to the road is quite important to you...

So for all of you who still hasn't finish your drive way, there's this little extra thing FYI and hope you find it helpful!

Tuesday, 11 September 2007

[Tips.016] How to record issues about your construction, in case you need to bring your builder to court

Thanks to stonecutter1309 from homeone.com.au forum, we have this information about how to record any issues/problems regarding your construction work, in case you need to bring your builder to court...

Hope all our construction works goes on smoothly and never need to take legal action against our builders. But sometimes we just need to be prepared, just in case things get out of control. Details below:


I received this piece of advice in terms of documentation from a friend who has taken a number of builders to court and always come out ahead of the builder. The best way to record any issues are as follows.

1. Take a regular exercise book - stapled in the middle (spiral notebooks are no good - pages could be removed - the book needs to appear complete and tamper-free)
2. Record the date and time of each issue in detail.
3. On the very next line - sign your name and date.
4. On the very next line, use a pen & ruler to draw a line across the page

The idea is not to leave any lines blank - as a judge or mediator may see blank lines in previous entries as a method you may use for manipulation at a later date. (that is, adding extra entries, more details etc)

However, if you fill every single line with writing, date/signature or the line ruled at the end of the issue - then the person reading the book is more likely to think that your records are a complete take on the situation.

I'd also require a "read receipt" on every email you send - and keep copies of the receipts as proof the builder did receive the information you sent them (sort of like registered post)

Monday, 10 September 2007

[Tips.015] The more you research the more you could save

During the "APEC" long weekend, we visited a few shops to get some quotes on mirrors and shower screens. Those hard working shops who are willing to stay open during the long weekend definitely will get more business!

When we spoke to our builder earlier this year, they want to charge us $100 for "upgrading" each mirror from "framed" to "Bevelled edge". We visited a few shops and found that you can get a bevelled edge mirror for less than $80! For your reference, different edge type of mirror edges from Stegbar web site.



When we asked our builder how much it would cost to upgrade the framed shower glass to frame-less style, they charge $1600 each and we decided to remove it and do it ourselves after handover. We got a few quotes and so far the best price we can get is around $1200 including installation.

We found a supplier during the weekend who only supply materials, as long as our shower is using "standard" size, the cost will be around $450-$600. They don't do installation but can recommend someone who can do it for around $250. Shower screens that are not standard would cost double as it has to be specially made. And their "standard" sizes are: 800, 900, 1000 and 1100 mm. We quickly checked our drawings and it says "1050 mm", what the *%^%#$%$!$@#!

After some discussion, we decided to ignore the drawing and visit the showroom at Kellyville again to measure the the exact dimension of the shower area ourselves. It's a long drive but would definitely worth the effort... We found that the internal shower area inside the hob is 1000 mm, but the hob itself is 100 mm wide! This means we can actually take either 1000 or 1100 mm shower screens thanks to the wide hob. Problem solved, yeah!

Technically, I think you can say that our builder is right by marking the shower size as 1050 mm with half of the hob width is included. But when looking from "all builders are greedy and evil" point of view, I would say they did it that way purposely so that whoever tried to install shower screens after handover might change their mind as that's not a standard size and would cost a lot more...

Anyway, the more you research the more you could save. Back in June, I mentioned in this post
"Tips.004 Always do your homework" about a few options. Building a house involves lot of money, we all need to do more research to save!

Wednesday, 5 September 2007

[Tips.014] Down pipe and external light at the same location

Thanks to vanderlay from homeone.com.au forum, we now have one more thing to check during your drawing/sketching stage with your builder.

As shown in photo below, you can see the white wire for an external feature light. But right on top, there was a square connector from the gutter -- that's for the down pipe!

This means if the electrician installed the light first, the plumber won't be able to install the down pipe. Similarly if the plumber puts in the down pipe first, the electrician can't install the light!

Another example of builder mistakes... I guess it's because the gutter/down pipes are done in separate drawings from the electrical one, and whoever did the drawings didn't do a proper cross checking.

Luckily, vanderlay's builder agreed to get the down pipe relocated to fix the problem. But that's definitely an unnecessary delay no one wants to have during any construction. So if you are building a new house, make sure you cross check all the different drawings for possible issues like this!

Wednesday, 15 August 2007

[Tips.013] Keep Track of Daily Weather Observation Records

When you sign the contract with your builder, you will notice there're a few clauses which talks about weather.

What it actually means is, if your builder finished your house on time, there's nothing to worry about. If you are unlucky and it wasn't on time due to whatever reason, the builder will get some figure about number of raining days, double it (every raining day requires extra day for the site to be dried), then use it as excuse for negotiation.

I briefly talked about this in my previous post [Tips.006] Ask for a copy of Contract in early stages.

This tips is about: instead of waiting for your builder to provide some high figure which you might not know how to verify, you might want to start collecting that data yourself. And it's quite simple, just visit this web site from Bureau of Meteorology.

As shown below, the web site shows the daily weather observation record of past 13 months for all areas:

I clicked on Sydney and this is what I got for the current month:

Scroll to the bottom and you can choose any record from previous 13 months. So all you have to do is check it once every few months and write down the total number of raining days. Or you might even want to print it out for record!

Hopefully everything is on time and you won't need to use this, but who knows, better be safe than sorry!

Wednesday, 1 August 2007

[Tips.012] Information about speaker sets

Thanks to Mark/Cookiemonster from homeone.com.au forum, the following 3 diagrams provide a simple example for setting up your speaker sets depending on whether your system is 5.1, 6.1 or 7.1.

Home theatre system are getting quite popular nowadays. I am not sure how much $ will be left after all my construction work finished next year, but I definitely want to invest some money for a proper system.


Tuesday, 24 July 2007

[Tips.011] Downlights could set fire to insulation in the roof if not installed properly

Thanks to information provided by clath from homeone.com.au forum, I found this article titled "Downlights fire warning" from Channel 7 Today Tonight web site talking about the danger of downlight setting fire to insulation in the roof.

There's even a video on the web site.


"Ceiling downlights are a serious fire risk thought to cause at least one home fire per week by igniting roof insulation. And because they burn in the roof cavities above fire alarms residents only know their house is burning when the ceiling collapses."

"Metropolitan Fire Brigade investigators Rod East and Colin Fowler say over the past 18 months, in Melbourne alone, more than 57 houses have been damaged or destroyed by a downlight fire."

"Electrician and Managing Director of A and F Electrical, Frank Spiteri, blames a "do it yourself" mentality sweeping across Australia, for an increasing number of dodgy installations."

I guess it could be caused by the downlights not been insulated/installed properly, or the insulation not been installed properly, or both.

If you have downlights in your house, you might want to get a licensed eletrician to check if it's correctly installed!

If you found any problem and looking for solution, thanks to Mark/Cookiemonster from homeone.com.au forum, the following 2 products would certainly help:

(1)Isolite - Downlight Guard 94-114 for $14.95 each.




(2)Isolite Transformer Isolator for $9.95 each.

Monday, 23 July 2007

[Tips.010] Possible Issue with Large Windows - if you want a FSSF one...

Like to share some information we learned about large windows. We had 3 large windows in our house design and we had a bit of problems during colour selection. (Note: when I say "large windows", I am talking about windows wider than 2M).

What happened is, we noticed all large windows displayed in our builder's display are done in "SFS" style (Note: S means sliding panel, F means fixed panel, refer to picture below). In simple terms, that means the (much wider) middle part is always fixed, and only 2 smaller part at both end are sliding panels. We understood it is designed this way to cut the cost down. And regardless of how wide it goes, the 2 smaller sliding panel are always in the same width (about 600mm). I also spoke to quite a few people and not many people actually notice that.

We think it doesn't look good, plus with curtains installed on top, about 30% - 40% of the opening part could be blocked by the curtain. We did some research, found the supplier's brochure (see PDF link below), in the brochure there was a statement saying "FSSF windows are available in sizes 1810mm in width and larger". Based on all these, we asked for "FSSF" style window to be installed on all 3 large windows.

Picture of windows supplier's brochure shown here for your reference (Note: you can download/view the full PDF from this link, the section shown is in page 4 of the brochure):


When we received the quote we were shocked to find that they want to charge us $675 for changing the 3 "SFS" windows to "FSSF" style. I called the supplier's 1800 help desk number and asked for a quote to compare the price differences between the 2, and this is what I was told (only asked for cost to supply material, since delivery and installation cost should be quite similar for 2 different styles):

  • 1.2M x 2.1M: 4 panels (FSSF) - $305.85, normal 3 panels (SFS): $290.40 ==> we have 2 of this windows.

  • 0.9M x 2.4M: 4 panels (FSSF) - $293.70, normal 3 panels (SFS): $281.60 ==> we have 1 of this windows.



We then have a big argument with the builder about this. They even have the supplier's sales rep on the phone for about 45 min to talk about this. Here're some of their points:

  • "FSSF" windows leaks, it is not recommended to be installed unless it's for internal windows (e.g. inside house facing alfresco) -> how many house would have internal windows? And how come this wasn't mentioned in the brochure?

  • Around 80 - 90% of the windows cost is in labour, the material only cost very little

  • Reason for the high cost is, they are actually installing 2 smaller windows (1 in "FS" and the other in "SF") to achieve the same result



As we are the poor customer who doesn't know much about the industry, in the end we have to give up the idea of changing any large windows to "FSSF" style due to the high cost involved.

So, if you have some large windows, this is to let you know that it doesn't have to be in "SFS" style. And if you don't like it in "SFS", be prepared to pay a few hundred dollars to change to "FSSF" (or actually 1 "FS" + 1 "SF" if it's external facing), and that is for every window you want to change...

Hope you find this tip helpful...

Tuesday, 10 July 2007

[Tips.009] Be careful with all notice signs in display homes

What I like to talk about today is notice signs in display homes. What I mean is, when you visit the display homes, sometimes you will see a sign saying what's been displayed is not included (read: you have to pay extra for the upgrade). Or you might see notice signs saying the item been displayed has been changed. Whenever you see signs like that, make sure you understand what it means. Also, don't forget to take a photo or write it down.

Let me give you an example from our builder, the first photo shown here is the standard kitchen on display. We took this photo on April 2006.

Then another one from different angle on September 2006.


Later, on February 2007, we noticed a sign been posted on the cupboard. Have a look and see if you understand what it means.

We thought: ok, so they are increasing the fridge space for bigger fridges. That's good!

It wasn't until we visited a few houses built by our builder in March 2007 then we noticed something wrong. Have a look at this one:

And this one:

Did you see anything wrong? Give you a clue: compare the cupboards above the fridge space with the first 2 photos.

When they say "increased in height", that doesn't mean they will move the whole cupboard higher. What it actually means is, the top level will remain the same, but the bottom part will be chopped off (and you are not getting any credit for that!).

We went back in April 2007 and took this photo with the measurement tape. You can clearly see that the original fridge space is about 1710 mm. When it's increased to 1820 mm, you lose about 110 mm of cupboard space. And the whole thing will look out of proportion as the 3rd & 4th photos shown above.


Luckily we went back and check earlier this year, otherwise we could have miss it. We argued about this but there's not much we can do. In the end we still have to pay some extra money to increase the height of all the top cupboards to make it looks better. Nothing is free in this world...

Remember 2 things: 1. if you see any notice signs in the diplay home, make sure you understand what it means. If you are not sure, ask the sales for further information.

2. always go back to the display home and check before you sign the contract, they might have added some notice since your last visit.

Hope you find this tip helpful!

Sunday, 8 July 2007

[Tips.008] Do you have eaves for your new house?

The lovely weather only lasted about a week and it started rainning again....

The next tip I like to talk about is eaves. I think eaves are quite important and I was quite surprise to see lots of builders removed eaves from their houses.

Eaves helps your BASIX rating and houses without eaves looks like faces without eyebrow. When we dealed with Clarendon, we have to pay a few thousand dollars to add eaves. Why should I pay money for something that should have been included as standard in the first place?!

Found a few web sites with information about the importance of eaves, which you might be interested:

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
This web site from NSW government has some handy tips and easy to understand pictures on ways to save water and energy, And here's one of them about eaves:



= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
This web site "Your Home Technical Manual" from greenhouse.gov.au mentioned a few things when choosing project home designs, as quoted below:

1. Select a design that can be positioned on your site to capture cooling breezes, particularly to living areas. Avoid large areas of west facing windows.

Most project home companies will mirror or flip a design to suit your needs at no extra cost.

2. Moving windows or doors from one elevation to another to capture cooling breezes often adds no cost but makes significant improvements to performance.

3. Avoid windows with fixed glass. Ask for windows with a significant openable area for ventilation.

4. Ensure that all openings are suitably shaded. Use landscape as an effective means of providing additional shade.

5. Ask for eaves to be included if the design has omitted them. ==> Why should they specifically mention this? There must be lots of project home builders omitting eaves in their design to cut cost!

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
This web site from SA government also mentioned the followings:

A house with no eaves and no additional shading to the windows is required to have less glazed area than a house with eaves.

Good shading of windows (such as eave overhangs) and good orientation of the house (so that the main windows to living areas are facing due north) will enable the new requirements to be met for minimal cost (a few hundred dollars for more efficient insulation).

Tuesday, 3 July 2007

[Tips.007] Are you installing clear glass for your bathroom windows/bedroom doors?

Noticed a few discussions in homeone forum about clear glass.

One of the owner chose quite mordern bedroom doors with some glass openings. Only during construction did he notice that it's in clear glass, and it's too late to change (Note: project home builders charged min $250 - $500 on top of the $ for the change, for every change after contract signed). Just imagine all your bedroom doors with clear glass openings, although it's inside the house, how embarrass it would be if anyone can see through the door while you are changing! I guess one possible option is to stick something on the glass or cover it up...

The other common mistake owners normally make is to install clear glass for bathroom windows. There are still some builders doing this and then charge extra to change the windows glass to obscure glazing. Luckily our builder has this covered as standard. Personally I think there should be a rule/regulation or something about this setup to protect the owner. It's just ridiculous to have clear glass for bathroom windows.

Hope you find all these tips helpful.

Monday, 18 June 2007

[Tips.006] Ask for a copy of Contract in early stages

I found a lot of people asking questions in homeone.com.au forum about the progress payment details. You can actually ask your builder for a copy of the contract in the early stages (e.g. after you paid $600 for your initial site survey, soil test, ...etc, or before paying for preparing drawing for council submission).

Most project home builders use the standard "Building Contract for New Dwellings" from HIA (this link is for NSW, other states also available). Anyone can spend $22 to get a copy. But it's the changes your builder added that makes each builder's contract unique.

Changes to Progress Payments
Using ours as example, the standard contract has 6 stages for progress payments: Floor slab complete, roof frame complete, close up complete, fixings complete, painting complete and practical completion. Our builder cross the whole lot and put in their own ones: deposit, slab, frame, roof on, lock up and practical completion, including a percentage for each stage. We don't like some of the figures and are working on it with the builder.

Other Changes
Our builder also added a few clauses here and there to protect themselve, such as:
"An automatic extension of time applies for every day a progress payment is late. No notification by builder is necessary."
"adverse weather means any rain day recorded by the Bureau of Meteorology - daily rainfall report." --> so if it rains in New Castle, our construction site in Sydney will have to stop, thanks for that!
....

The contract is in plain English, but I still recommend to find a solicitor to go through it for you.

If you can request for a copy of contract earlier in the process, you can try to work out any issues with the builder. Rather than having everything done and council approved then you are stuck and have not much bargain power in case you found some unreasonable surprises in the contract.

Thursday, 14 June 2007

[Tips.005] Check the location of your external lights

I learned this from another customer of our builde near Regents Park.

They have a neighbour just built with ******* Home, and high up under the eaves outside of Main bedroom on first floor, there was a sensor light installed. The idea was to put it high up there so that the area it can detect movements (and turn on the light) will be larger.

After they moved in, and electricity connected, they found that it's giving too many false alarms as the sensor picks up lots of activities from the neighbour's back yard as well. They tried to adjust the sensor and guess what, they can't reach it any more as it's too high and they have to pay someone with really long ladder just to adjust the sensor's covering angle. Of course the other option is to turn it off, but since you already paid the money for that, why border switching it off?

The lesson/tip is, if you are planning for external lights, make sure it's within reachable height.

Tuesday, 5 June 2007

[Tips.004] Always do Your Homework!

Building a house involves lots of money, you should definitely do your homework properly before making any commitment.

Some of the methods been used:
1. Ask friends/relatives/colleagues for opinion

2. Visit their display homes if available

3. Ask builder to provide contacts of existing customers who have built with them

4. Do some search on Internet for information related to the builder, try Google, Yahoo, or bestbuilder.com.au, ...etc.

5. Join some forums, one of the best one I have seen so far in Australia is homeone.com.au. I learned a lot from them, have a look and guaranteed you will find it very helpful as well.

6. Spend $600 (some asked for more) for an initial soil test, tender and drawing. After you look at the tender, went through a presentation, you might have a different idea about what's to be expected.

7. Shop around, as the designs are all different, it's difficult to compare apple to apple. But you can have a better idea of what each builder can provide with similar amount of money. Compare the size, number of rooms, interiors, kitchen, ...etc


Before we decided to go with our builder, we did lots of research. We visited at least 5 of their clients, some of the good things about them:

1. For similar amount of money, you can get bigger house, that is, cost per square meter is lower when compared to D*****, C****** and a few others.

2. It's a personal thing, we love bay windows, and some of their models (Princeton and Palace Regent) have a few bay windows included as standard. With Allworth, they don't do bay windows at all. With D***** and C****** you have to pay a lot extra for that.

3. They included lots of things as standard: hobs for all shower, granite benchtop for kitchen, all external walls are in brick (E*****, D***** used lots of timber on 1st floor), obscure glazing window for all bathrooms, the section above garage door are all in brick (D**** and C***** use timber)...etc.

4. They are quite flexible with changes. Some of the builders don't like to change their design. We have lots of difficulty with some builders in making changes, our builder is more flexible on that. But like all other builders, they all charge a lot for any changes.

5. They are willing to tack the skirting boards so that our timer floor installation won't cause major damage to our walls. D*****, C******* and A***** won't do that at all.

For the bad side:
1. I found this post from homeone.com.au where one of the client was very unhappy with them.

2. It's a family business, due to the size they can be quite slow. Specially with services after hand-over and dealing with council. For example, for council part, G*** is only person handling all documents. When it gets really busy there could be some delays. Luckily we have past that stage, our approval took 4 months, which we think it's not that bad.

We visited one Chinese family in North Epping, our builder still haven't install the air conditioning one month after hand-over.

3. We also visited a family who wasn't quite happy with them. I heard that during their construction, our builder was going through some restructure and changed 3 site managers/supervisor. Also, the client is not very happy about the tender price gone up $6000 in 6 months -- unfortunately that's the nature of the game, if you can't get council approval or still wouldn't sign the contract, it goes up every few months, not much you can do about that.

4. My colleague A*** at Hursville was also complaining about their slowness. He had to make lots of phone calls to get someone for post handover service. According to A*** the things that required service so far were: leaking laundry tube, a window that won't close properly and a door that won't shut properly.

So based on all above, after compared with all other builders, we still choose our builder.

To cover our back, we are also going to hire private inspector to check their work before we make any payment. G****, our landscaper also suggest us to buy some beers for the workers.

We will certainly keep a close eye on the construction work (we currently lived about 200M away from the place we are building) and hopefully everything turns out ok with not too many problems or surprises.

Friday, 1 June 2007

[Tips.003] You might need to start landscaping work before your construction...

Yes, I am not joking. If the frontage of you land is not wide enough and your land requires retaining walls at the back, you might need to start landscaping work before your construction...

Our neighbour waited more than 12 months for their house to be completed (almost there...). They started getting quotes for landscaping and then they found a major issue. The paths on both side of the newly build house is only about 1 M wide, that is, the gap between the newly build house and the fence on both sides. But the landscapers' hole drilling machines are much bigger/wider than that! This means all the hole drilling work (for retaining walls) has to be done by hand, and that would be really expensive.

Luckily both our backyards join together, there's no fence at the moment and we just got our house demolished. If they can get their hole drilling work done before our excavation starts, we don't mind them accessing their back yard through our currently vacant land.

To avoid the same mistake, we already have an arrangement between our landscaper and the builder. The builder will excavate the land first so that the cut and fill are all done, and everything in correct level. The builder will then put everything on hold for 2 weeks for our landscaper to finish the retaining walls at the back. The construction will then continues, and the landscaper will finish the front part some time next year...

So unless your land got wide frontage, or you are one of the lucky ones who have a flat, even land, and don't need to have any retaining walls at the back - don't forget about your landscaping!

Thursday, 31 May 2007

[Tips.002] Ask you builder not to fasten/fix the skirting boards if you are installing timber floors latter

Everyone likes to have timber floors in her/his new house. Problem is, project home builders charged a lot for that. So far, we haven't seen many owners installing timber floor with the builder. Most of them just leave the floor as it is, and then install timber/carpet or other floor coverings after hand-over, and that's what we planned to do as well. After a few discussions with some new home owners, we found a common problem - the skirting board.

Project home builders always fasten/nailed the skirting board and have it painted before the hand-over. Unfortunately when the flooring people tried to install the timber floors, the skirting boards need to come off, otherwise the edges under the wall won't be covered properly. And yes, that could easily damage your brand new wall - also don't forget that it's every single wall surrounding the area you are installing timber floors!

Yes, there's another option - to install an extra edging in front of the skirting boards. Well, you then get an extra layer under every surrounding wall. Personally, I don't think that looks good, but it's one possible solution.

We also tried to ask the builder to leave the walls as it is and don't install any skirting board in the whole house. Guess how much credit for that? Less than $350! Yes I am not joking. They charge you arms and legs for any variation, and only give you peanuts if you ask for any credit. That's how these project home builders make money...

Finally, the last option is the recommended one: ask the builder not to fasten/fix the skirting boards. Just use a few nails to "tack" it (tacked skirting). Unfortunately not many builders are willing to do that. Domaine, Clarendon, Bellmarch all said no. Our builder has no problem with that, but even though we have been talking about this since day 1, we made a big mistake - we didn't get it written into the tender!! When we latter discovered this, they want to charge us $400 for that. We fought very hard for it, but as all drawings are done and approved, colour selection also almost done, we can't do much about that.

This is another lesson we learned - try to get everything covered and negotiate the price with the sales at the beginning. When it comes to the colour selection or latter stage, you are already hooked and lost most of your bargain power. The sales are more willing to negotiate as they are trying to get your business.

[Tips.001] Do you have a hob under your shower screens?

We are currently living in a house not far away from where we are building. It's a duplex and according to Council record, the house was built around 1995.

This house has 2.5 bathrooms. Both bathrooms upstairs have a shower area, but none of them comes with hob under the shower screens. That is, the shower screen was installed directly on top of the flooring tiles. There wasn't any tiled barrier (hob) normally constructed from masonry to divide the shower area.

Since we moved in about 3 years ago, there were some cracks on the wall next to the Main bathroom shower, recently the tile starts to crack as well.

Spoke to some plumbers and tilers, they all said the same thing - shower screens installed directly on top of flooring tiles won't last long and will definitely leak after a few years.

This is one of the reasons we choose our builder, they have tiled hob included in all bathroom shower areas as standard. If you are building a house or renovating, strongly recommend installing a hob for your showers.

Found a few links related to this:
Link #1
Link #2

Photo of Tiled Hob in builder's display home Ground Floor Bathroom


Photo of Tiled Hob in our builder's display home 1st Floor Bathroom