Tuesday, 17 June 2008

[PropertyInfo.030] Charlie's sad story

There's this sad story from Sydney Morning Herald yesterday about a Cabramatta bus driver who has dispute with his builder and has been living in caraven since 2002.

According to the article "the ground was never compacted and no slab laid", and "the right side of the house starting to sink into the earth".

Although this is only one side of the story, would be interested to see how can the builder explain how did the house pass the council engineering inspection on the slab stage before laying the bricks.

It's always sad to see stories like this happening, just wonder if Charlie had inspected the house with a private inspector much earlier, it would be much easier to pick up any problem and much cheaper to fix.

Saturday, 14 June 2008

[Progress.128] Landscaping update - 2

Our landscaper Joe got all the steel mesh reinforcement installed and ready for concrete. This is for the alfresco at the back.

This is the footpath at the front. You can also see the mesh reinforcement in the footing for the brick fence at the right hand side.

This is the drive way.

The concrete pump truck quickly connected a long pipe to the back of the house for the alfresco. Later the concrete mixer truck arrived, and the show begins...

Similar to what happened last year (see this post "69 concrete piers" for details) when they did the concrete piers, they pump the concrete on the steel mesh, stir it, and then level the surface with a huge long leveling stick.

I got a short video here as well:


That is a very long leveling stick!

The next day, our alfresco looks complete different! The muddy areas outside will be covered by paving soon...

This is the area where we enter the alfresco through the sliding door.

The new foot path looks nice and clean! The footings are ready for the brick fences as well.

And of course, our drive way. Just have to lay the pavings on top...

To be continued...

Friday, 13 June 2008

[Progress.127] Landscaping update - 1

This is the first update of our landscaping. Our alfresco looks like this in early March...

Our landscaper Joe started cleaning up the area and preparing for retaining wall in end of April.
The next day, the excavation for driveway was completed.
The old concrete foot path also removed.
The next day, Joe got the timbers installed, ready for new foot path. The footing for brick wall also done in a day, all done by hand, lots of work! I also took Joe's advice and wrote down detail measurement about the location of all those pipes (Telstra, sewage, storm water, gas) shown in upper part of the photo below.
In 4 days, Joe got the whole area ready for council inspection and it passed without any problem.
A bit late now, will post more photos about the concrete slab pouring in next post.

Wednesday, 11 June 2008

[Progress.126] Wardrobes shelves and curtains done

I will try to show some photos of what happened in past 2 weeks in a few posts. First is our wardrobes, they arrived the other day with the drawers already assembled, using the same handle as our kitchen.

This is what our wardrobe used to look like for my daughter's room. Because the basic ones provided by builder only have one shelf plus one hanging rail, we decided to cancel all of them.

If you have been following my post, all our wardrobe shelves are done by the same joinery who did our laundry cabinet. This is the same room after everything completed.

This is for the smaller rooms.

You might noticed that part of the top shelves were quite high. We did it like this to better utilise it because the top of all wardrobes are the same height as our 2.7m ceiling. The higher shelf makes it easier to store less frequently used stuffs.

Our WIR is hidden behind a sliding door, can't show you too much details as that's my wife's special area. This is about 30% of it...

We put in 2 hinged doors on the top of WIR so that part of it can be fully covered. Unfortunately we forgotten about the light, and it has to be removed and later changed into downlight so that it doesn't block the doors.

We did the curtain installation ourselves, and this is one of the bedrooms upstairs.

This is another one in slightly different colour.

This is one of the downstairs one, with our new lights.



Sunday, 8 June 2008

[Progress.125] We finally moved in!

After a few week's preparation, plus some hard work, we finally moved in to our new house mid last week.

Although it's only about 200m away from the old house, still using the same phone number, still with Telstra, and with the same telephone exchange, somehow I still lost my ADSL connection and got cut off from the Internet for almost 2 weeks. I take the opportunity to dump the old ADSL1 from extel and switch to ADSL2 from TPG.

We have the air conditioning completed, installed some lights, finished the brick fence at the front and the concrete slabs for drive way and alfresco at the back. But due to Boral running out of stock with the blocks we want for retaining walls, plus the continuous rain in past week, looks like our landscaping won't be fully completed for at least another few weeks.

Will try to post some photos very soon!