Brick work continued, brick work above garage door finished, alfresco brick post started, brick work for 1st floor also started.

Unplanned expenses:
Builder tried to ask for extra $800-900 for sewer connection, still fighting for it...

1. Steel beams in Alfresco been joined instead of one full piece, painted with orange paint. Not sure if this is structurely sound and safe
2. Found a hole on the floor board of bedroom above garage
3. 2 "Noggings" in frames of bedroom above garage damaged
4. Sewage pipe (in front of property) broken
5. 1st floor main bathroom windows was installed with clear glass windows instead of obscured/glazed ones
6. Right hand side supporting steel beam in garage not bolted to groung ==>Issue resolved!