Achievements:
Brick work continued, brick work above garage door finished, alfresco brick post started, brick work for 1st floor also started.
Unplanned expenses:
Builder tried to ask for extra $800-900 for sewer connection, still fighting for it...
Issues:
1. Steel beams in Alfresco been joined instead of one full piece, painted with orange paint. Not sure if this is structurely sound and safe
2. Found a hole on the floor board of bedroom above garage
3. 2 "Noggings" in frames of bedroom above garage damaged
4. Sewage pipe (in front of property) broken
5. 1st floor main bathroom windows was installed with clear glass windows instead of obscured/glazed ones
6. Right hand side supporting steel beam in garage not bolted to groung ==>Issue resolved!