Friday, 4 January 2008

[WeeklySummary.017] Week 17 (22/11/2007) - (28/11/2007)

Achievements:
1. 1st floor roof tiles finished
2. 1st floor bricks cleaned/washed

Unplanned expenses:
None

Issues:
1. Steel beams in Alfresco been joined instead of one full piece, painted with orange paint. Not sure if this is structurely sound and safe
2. Found a hole on the floor board of bedroom above garage
3. 2 "Noggings" in frames of bedroom above garage damaged
4. Sewage pipe (in front of property) broken
5. 1st floor main bathroom windows was installed with clear glass windows instead of obscured/glazed ones
6. Drain pipe next to alfresco post been removed
7. Huge gap above external door and window, especially laundry area
8. Front hip roof above front windows not finished
9. Study room window broken

No comments: