Achievements:
1. Scaffolding for ground floor roofing done
2. Ground floor sarking, anti-ponding pad done
Unplanned expenses:
None
Issues:
1. Steel beams in Alfresco been joined instead of one full piece, painted with orange paint. Not sure if this is structurely sound and safe
2. Found a hole on the floor board of bedroom above garage
3. 2 "Noggings" in frames of bedroom above garage damaged
4. Sewage pipe (in front of property) broken
5. 1st floor main bathroom windows was installed with clear glass windows instead of obscured/glazed ones
6. Drain pipe next to alfresco post been removed
7. Huge gap above external door and window, especially laundry area
8. Front hip roof above front windows not finished
9. Study room window broken
10. Door frame for sliding door damaged
No comments:
Post a Comment